Cracks comes from rapid cooling or poor prep, Preheat steel to 200°F to reduce stress, My Hobart Handler had cracking issues too, Use 25 CFH argon for coverage, Set wire speed to 240 ipm for even welds, Clean with acetone thorough, Use 7018 electrodes for strength, Ensure slow cooling with insulation blankets, Check joint fit-up, Verify gas flow consistency.